Exterior LED fixtures were installed on South Campus, parking lots on Main Campus, across the Quad and front lawn of Main Campus, and near Flanagan gym in 2023. In 2024, exterior LED fixtures were installed on the roof of Bird Library, the Schine Student Center, Falk College, Haven Hall, and Machinery Hall. At the very beginning of 2025, fixtures were replaced on Flint and Day Hall and the Graham Dining Center. New fixtures were also installed on the roof of Watson Hall and outside of Booth and DellPlain Hall. The exterior fixtures on 111 Waverly, Huntington Hall, 804 University, and the Lawrinson Hall garage were replaced in the winter of 2025.
The installment of these new LED fixtures has helped reduced emissions by over 250 MTCO2e (metric tons of CO2 equivalent) each year. Sustainability Management plans to continue to replace exterior and interior fixtures. Interior lighting fixtures are currently being replaced fourth floor of the Bird Library.